PCE Nigeria Logo
OB3 River Niger HDD Crossing Completion Team

HDD Crossing. EPC for Pipeline.

  • Excellent HDD construction capability

  • Professional HDD drilling fluid scheme design and product supply capability

  • Comprehensive pipeline EPC construction capability

  • Deep buried pipeline detection capability

PCE AT A GLANCE

Specialist People. Field-ready Resources in Nigeria. Proven Capability.

View Gallery (5)
150+

People across five specialist construction teams

View Gallery (5)
1200t/500t/500t

Nigeria-based HDD rig and pipe-handling capability

View Gallery (5)
Equipment & Materials

Equipments & Materials in Nigeria

FEATURED CASE STUDIES

Landmark Crossings & Major Infrastructure Delivery

View All Projects
1.565 KM BENEATH THE RIVER NIGER

PCE completed the specialist HDD crossing for the 40-inch AKK gas pipeline beneath the River Niger through mixed sand, gravel and rock strata.

2 km

HDD crossing

48 in

Pipeline diameter
2 KM BENEATH THE RIVER NIGER

OB3 River Niger Crossing.

2 KM BENEATH THE RIVER NIGER

PCE executed the River Niger HDD crossing on the OB3 Gas Pipeline between Ndoni in Rivers State and Aboh in Delta State. The crossing combined a 48-inch pipeline, approximately 2 km of HDD and complex sand, gravel and rock strata.

1.565 km

HDD crossing

40 in

Pipeline diameter
OUR CAPABILITIES

Four Capabilities. One Project Objective.

From understanding the route to engineering the crossing and delivering the line, PCE combines four specialist capabilities around complex pipeline projects.

Explore Our Capabilities
View Gallery (6)
01

Horizontal Directional Drilling

View Gallery (4)
02

Pipeline EPC

View Gallery (5)
03

BPDS Pipeline Location

View Gallery (8)
04

Equipment & Technical Support